|
December 24, 2009
4k-8 study Monona Grove School District Report
Peter Sobol: At last nights board meeting former Winnequah Principal Patty McGuinness presented the results of the 4k-8 study commissioned by the board last summer. The report detailed the costs of implementing 4k-8 grade configurations in each community. The proposed configuration would require significant changes to Winnequah school to accomodate programming for Monona 3-8th grade students and some changes to Glacial Drumlin to shift CG 4th graders into the building.
The report (I'll link it here when it is up on the district website) was very thorough, and I found it a useful exercise to see all the costs and factors that go into making a school laid out in one place. It is worth a read on that basis. One issue identified from the study was that the scheduling wouldn't work with the current encore staff and additional staffing would be required. These additional requirements hadn't been worked out, but they would add to the costs included the study. Complete Report: 5MB PDF.
Posted by Jim Zellmer at December 24, 2009 7:35 PM
Subscribe to this site via RSS/Atom: Newsletter signup | Send us your ideas
|